Used Self Erect Cranes Riverside - Generally the base which is bolted into a big concrete pad provides the crucial support for a tower crane. The base is connected to a mast or a tower and stabilizes the crane that is affixed to the inside of the building's structure. Often, this attachment point is to an elevator shaft or to a concrete lift.
The crane's mast is normally a triangulated lattice structure that measures 0.9m2 or 10 feet square. Connected to the very top of the mast is the slewing unit. The slewing unit consists of a gear and a motor that enable the crane to rotate.
Tower cranes may have a max unsupported height of eighty meters or 265 feet, while the tower crane's maximum lifting capacity is sixteen thousand six hundred forty two kg or thirty nine thousand six hundred ninety pounds with counter weights of 20 tons. Additionally, two limit switches are used in order to ensure the operator does not overload the crane. There is even one more safety feature called a load moment switch to ensure that the driver does not surpass the ton meter load rating. Finally, the maximum reach of a tower crane is seventy meters or two hundred thirty feet.
There is definitely a science involved with erecting a tower crane, particularly due to their extreme heights. First, the stationary structure needs to be transported to the construction site by using a big tractor-trailer rig setup. Next, a mobile crane is utilized so as to assemble the machinery portion of the crane and the jib. These sections are then connected to the mast. Next, the mobile crane adds counterweights. Crawler cranes and forklifts could be some of the other industrial machinery that is usually used to erect a crane.
Mast extensions are added to the crane when the building is erected. This is how the height of the crane can match the building's height. The crane crew uses what is called a climbing frame or a top climber which fits between the top of the mast and the slewing unit. A weight is hung on the jib by the work crew so as to balance the counterweight. Once complete, the slewing unit is able to detach from the top of the mast. In the top climber, hydraulic rams are utilized to adjust the slewing unit up an extra 20 feet or 6.1m. Then, the driver of the crane uses the crane to insert and bolt into place one more mast part piece.